COASTAL RESTORATION // GALVESTON HISTORIC DISTRICT • REF #EVG-773190

Galveston Historic Surge: 22,000-Gallon Extraction & 100% Timber Salvage

When 2.5 to 4 feet of brackish Gulf storm surge flooded an 18,500 sq. ft. Galveston Victorian landmark, rapid bulk saline extraction and 10,000 CFM closed-loop desiccant drying stabilized 1890s longleaf heart-pine framing at 12.4% WME with zero historic demolition.

Galveston Historic District Victorian timber estate undergoing coastal storm surge recovery and structural drying
22,000 GalBrackish Surge ExtractedPurged from subfloor & ground level in 14 hours.
100%Historic Timber SalvageZero demolition of irreplaceable 1890s millwork.
12.4% WMEStabilized Timber EquilibriumReduced from 94% subfloor ERH without warping.
7 DaysPsychrometric RecoveryConfirmed under independent PRV clearance.

Coastal Surge Threat to Historic Masonry & Longleaf Pine

Tropical cyclone tidal surge inundated the ground story and subfloor crawlspace of an 18,500 sq. ft. 1890s Victorian estate in Galveston’s Historic District with 2.5 to 4 feet of brackish saltwater. Initial psychrometric logging recorded 94% equilibrium relative humidity (ERH) in concealed subfloor cavities alongside rapid opportunistic amplification of Aspergillus and Penicillium spores across dense virgin heart-pine joists.

Standard flood tear-out would have permanently destroyed hand-milled 19th-century cypress baseboards and structural longleaf pine framing while shocking hygroscopic masonry with uneven drying stress.

Closed-Loop Saline Mitigation & Controlled Psychrometrics

  • 14-Hour Bulk Brackish Extraction: Restoration crews executed continuous weighted extraction across flooring, voids, and crawlspace sumps, removing 22,000 gallons of saline floodwater and mineral sediment before salt crystallization locked inside wood pores.
  • 10,000 CFM Closed-Loop Desiccant Drying (ANSI/IICRC S500): Rather than superheating damp framing and splitting historic grain, engineers modulated grain depression below < 30 GPP using trailer-mounted desiccant dehumidifiers paired with calibrated infrared moisture tracking.
  • FIFRA / TDA-Compliant Botanical Treatment: Exposed framing received EPA-registered thymol botanical antimicrobial sanitization strictly following FIFRA and Texas Department of Agriculture (TDA) product label directions.
Structural Parameter Day 0 Coastal Surge Intake Day 7 Post-Drying Equilibrium Benchmark Target
Bulk Brackish Floodwater 22,000 gal standing saltwater 0 gal (extracted within 14 hours) ANSI/IICRC S500 Cat 3
Subfloor Cavity ERH 94% ERH (high spore risk) 44% RH closed-loop equilibrium ASHRAE Zone 2A target
Heart-Pine Framing WME 29.5%+ fiber saturation risk 12.4% WME (zero dimensional warp) Historic timber preservation
Historic Millwork Salvage 18,500 sq. ft. estate at risk 100% cypress & heart-pine retained Zero historic tear-out
Operational Independence & Conflict-of-Interest Separation (Tex. Occ. Code § 1958.155): Envirogyn acted solely as the Building Restoration Contractor on this Galveston salvage project. Final Post-Remediation Verification (PRV) visual inspection and independent ASTM D7391 clearance sampling confirming indoor levels matched clean coastal outdoor baseline were performed by an independent, non-affiliated third-party licensed assessor.

Verified Outcome

Within 7 days, framing moisture stabilized safely at 12.4% WME with zero checking or warping, preserving 100% of the estate’s original 1890s cypress trim and heart-pine structure under independent post-remediation clearance.

Schedule an Independent Assessment, Lab Assay, or Restoration Scope

Maintain strict Tex. Occ. Code § 1958.155 separation by selecting either our Environmental Consulting & ASCP-Directed Microbiology Laboratory track OR our Building Restoration track.

Call (281) 694-5742