Specialist Track 01 • Indoor Ecology & Statutory Protocols

Mold Assessment Consultant / Technician

Conflict-free forensic moisture mapping, radiometric FLIR thermal scans, ASTM D7391 air & surface sampling, written Mold Remediation Protocols (MRP), and third-party Post-Remediation Verification (PRV) clearances.

View Packages & Pricing ↓
ANSI/IICRC S530 & S520 ASTM D7391 & D7910 24–48 Hr Report TAT Tex. Occ. Code § 1958.155
Mold Assessment Consultant conducting FLIR thermal imaging and calibrated moisture mapping inside a modern Gulf Coast interior
What We Test & Verify

Non-destructive physics paired with clinical microscopy.

Before opening drywall or authorizing demolition, our consultants map hidden building moisture sources and verify fungal ecology through in-house laboratory oversight.

Envelope & Psychrometric Forensics

Radiometric FLIR & Moisture Mapping

Calibrated thermal imaging cameras, pinless dielectric hygrometers, and dew-point loggers pinpoint roof, plumbing, and HVAC condensation anomalies behind finished assemblies without destructive cutting.

See MAR & Screening packages ↓
Radiometric FLIR thermal imaging camera and calibrated building moisture instrumentation kit
In-House Clinical Oversight

ASCP-Directed Clinical Microscopy

ASTM D7391 bioaerosol spore traps and D7910/D7658 surface lifts are read in-house under Board-Certified Medical Laboratory Scientist direction (MLS(ASCP)CM #246841) for rapid option-period and PRV turnarounds.

Inspect ASCP #246841 Credential →
Envirogyn clinical microbiology bench analyzing air spore trap cassettes under compound brightfield microscopy
Written Protocols & Clearance Certificates

Defensible documentation built for contractors, insurers, and closings.

Every Mold Assessment Report (MAR), written Mold Remediation Protocol (MRP), and Post-Remediation Verification (PRV) clearance package includes photographic moisture maps, comparative indoor/outdoor spore tables, engineering-control boundaries, and unambiguous pass/fail criteria.

24–48 Hr Written MAR & MRP Report Turnaround
§ 1958.155 Zero-Conflict Statutory Separation
S530 / S520 ANSI / IICRC Protocol & Clearance Criteria
Preview of an Envirogyn forensic mold laboratory analysis and written remediation protocol deliverable
Packages & Transparent Pricing

Fixed residential rates & commercial consulting scopes.

Book standardized residential assessments, protocols, air/surface visits, and Post-Remediation Verification clearances directly via Stripe, or filter by scope below.

Services Provided by Mold Assessment Consultant / Technician

MAC-103 • Flagship $695
24–48 Hr Written Protocol & Report

Comprehensive Forensic Mold Assessment (MAR)

Full-structure moisture mapping, thermal imaging, ASTM air & surface sampling with ASCP-directed microscopy, and written findings dossier.

ANSI/IICRC S530 • ASTM D7391 Scope →
MAC-104 • Combo $895
24–48 Hr Written Protocol & Report

Combined Mold Assessment (MAR) & Remediation Protocol (MRP)

End-to-end diagnostic inspection paired with a contractor-ready written Mold Remediation Protocol detailing containment, negative air, and clearance criteria.

Tex. Occ. Code Ch. 1958 Scope →
MAC-105 • Statutory $450
24–48 Hr Written Protocol & Report

Standalone Statutory Mold Remediation Protocol (MRP)

Written remediation work specification governing engineering controls, PPE, demolition boundaries, and post-remediation pass thresholds for contractor execution.

16 TAC 78.100 • IICRC S520 Scope →
PRV-201 • Clearance $445
Same-Day / 24-Hr Lab Turnaround

Post-Remediation Verification (PRV) & Certificate of Mold Damage Remediation

Independent final clearance containment audit, ATP/moisture dry-standard checks, and airborne/surface verification sampling with state certificate sign-off.

PRV-202 Commercial From $595 • PRV-203 $245 Details →
MAC-102 • Real Estate $495
24–48 Hr Option-Period Rush

Real Estate Option-Period Mold Inspection (MIR)

Rapid-turnaround buyer/seller option-period evaluation combining non-invasive moisture probing, FLIR scan, and baseline bioaerosol verification.

Option-Period Rush Eligible Details →
MAC-101 • Targeted $295
24–48 Hr Written Protocol & Report

Targeted Visual, Moisture & Thermal Screening

Focused single-zone anomaly investigation around a suspected plumbing leak, window intrusion, or HVAC condensate stain prior to destructive opening.

MAC-107 Full Envelope FLIR $395 Scope →
MAT-111 / 112 / 113 $275–$395
Same-Day / 24-Hr Lab Turnaround

Standalone Mold Air & Surface Test Visits

Technician-collected spore-trap air cassette visits (MAT-111 $349), surface bio-tape/swab visits (MAT-112 $275), or combined 4-sample visits (MAT-113 $395).

ASTM D7391 / D7910 / D7789 Air & Surface →
MAC-106 • Mechanical $395
24–48 Hr Written Protocol & Report

HVAC Air Conveyance, Coil & Plenum Hygiene Assessment

Inspection of air handlers, evaporator coils, fiberglass plenums, and supply registers with surface microscopy and NADCA/ASHRAE hygiene grading.

NADCA ACR • ASHRAE 62.1 HVAC Protocol →
MAC-108 • Commercial From $895
Scheduled Commercial Turnaround

Commercial, School & Institutional IAQ & Mold Survey

Multi-zone indoor air quality benchmark survey aligned with U.S. EPA Tools for Schools and EPA 402-K-01-001 commercial moisture-control frameworks.

EPA 402-K-01-001 EPA Alignment →
PRV-204 • Oversight $650
Scheduled Commercial Turnaround

Remediation Containment & Negative-Air Field Oversight

Third-party monitoring of critical barriers, manometer pressure differentials (-5 Pa), HEPA scrubber exhausts, and contractor compliance during active work.

MCON-402 Drying Audit $395 Request →
MCON-401 / 403 $450–$750
Scheduled Commercial Turnaround

Written Mold Management Plan & Pre-Drywall Moisture Audit

Facility Operations & Maintenance Mold Management Plans (MCON-401 $750), Pre-Drywall Audits (MCON-403 $450), and Contractor Bid Walks (MCON-404 $350).

ISO / ASHRAE O&M Request Plan →
MCON-405 • Legal $350/hr
Scheduled Advisory / Field Mobilization

Mold, Water Intrusion & IAQ Expert Witness Testimony

Litigation-grade technical file review, causation analysis, psychrometric reconstruction, and sworn deposition or trial testimony by a Consultant.

Attic / Crawl Diff. MFEE-502 $125 Retain Expert →
Conflict-Free Statutory Separation

Independent science with zero contractor upsell.

In strict alignment with Texas Occupations Code § 1958.155, Envirogyn maintains total operational separation between diagnostic Consulting/Laboratory evaluations and contracting work. Our findings, protocols, and clearance certificates protect homeowners, lenders, and counsel from conflicted upselling.

Inspect Credentials →
Frequently Asked Questions

Common questions on Mold Assessment Consultant services.

What is the difference between a Mold Assessment Report (MAR) and a Mold Remediation Protocol (MRP)?

A Mold Assessment Report (MAR) documents moisture sources, laboratory spore counts, and affected areas. A Mold Remediation Protocol (MRP) is the formal written containment, engineering-control, and clearance specification required before remediation begins on regulated scopes.

Do I get a Certificate of Mold Damage Remediation after passing Post-Remediation Verification (PRV)?

Yes. Once containment passes visual, moisture dry-standard, and comparative air/surface clearance criteria under PRV-201 ($445), we issue clearance documentation and execute the assessor sections of the Certificate of Mold Damage Remediation.

Can Envirogyn run my Mold Assessment and also perform the demolition?

On projects where we act as the Mold Assessment Consultant, we maintain strict statutory separation aligned with Texas Occupations Code § 1958.155 and never perform the conflicting remediation work ourselves.

Call (281) 694-5742