MLS(ASCP)CM Cert. No: 246841 ISO/IEC 17025:2017 QA ASTM E1527-21 & D7391-20 ANSI/IICRC S500 & S520 Veteran-Owned
Home Restoration HVAC PROTOCOL
MECHANICAL AIR CONVEYANCE & DUCTWORK PROTOCOLS

HVAC Mold Protocol & Air Conveyance System Decontamination

Engineering protocols and NADCA/IICRC S520 decontamination for mold-impacted air handlers, blower assemblies, evaporator coils, fiberglass plenums, and supply ductwork.

HVAC PROTOCOL Envirogyn Assessment Division ANSI/IICRC S520 Remediation Division Envirogyn Laboratory
Call (281) 694-5742 Full Project Form
5.0 ★ Google Verified (26 Reviews) • Zero Upsell: Statutory § 1958.155 Firewall • Direct Dispatch: 15–60 Min Callback
Commercial HVAC containment and air conveyance decontamination equipment
Envirogyn Technical Practice Houston & Galveston Gulf Coast
TECHNICAL SCOPE & ENGINEERING STANDARD

Isolating Mechanical Amplifiers That Seed Entire Buildings

In coastal Texas humidity, condensation inside poorly insulated sheet-metal plenums and chilled air handlers creates an invisible fungal incubator that distributes spores to every supply register every time the thermostat cycles.

Whether acting as an independent MAC authoring HVAC remediation criteria OR as your mechanical decontamination crew, Envirogyn prevents system cross-contamination.

Methodology & Execution Workflow

STEP 01

Coil, Plenum & Trunk Audit

Collect direct bio-tape lifts from blower wheels, drain pans, and insulated interior liners.

STEP 02

Source Correction

Identify torn vapor barriers, negative return leakage, or missing UV/dehumidification controls.

STEP 03

Duct Removal vs. HEPA Cleaning

Specify replacement for contaminated porous ductboard vs. HEPA vacuuming of metal trunklines.

Deliverables & Regulatory Alignment

Deliverable / Parameter Governing Authority / Standard Turnaround / Output
HVAC Decontamination Protocol / Work NADCA ACR / ANSI/IICRC S520 Post-cleaning PRV swab & air verification
Call (281) 694-5742