MLS(ASCP)CM Cert. No: 246841 ISO/IEC 17025:2017 QA ASTM E1527-21 & D7391-20 ANSI/IICRC S500 & S520 Veteran-Owned
Home Restoration 5-STEP WORKFLOW
ANSI/IICRC S520 // ENGINEERED 5-STAGE RECOVERY

The 5-Step Mold Removal & Clearance Process

A clear, step-by-step walkthrough of how moisture diagnosis, third-party protocol authoring, HEPA containment, physical cleaning, and TDI Form MDR-1 clearance work together.

5-STEP WORKFLOW Envirogyn Assessment Division ANSI/IICRC S520 Remediation Division Envirogyn Laboratory
Call (281) 694-5742 Full Project Form
5.0 ★ Google Verified (26 Reviews) • Zero Upsell: Statutory § 1958.155 Firewall • Direct Dispatch: 15–60 Min Callback
Before and after view of controlled mold remediation containment and cleaned framing
Envirogyn Technical Practice Houston & Galveston Gulf Coast
TECHNICAL SCOPE & ENGINEERING STANDARD

Understand Every Step Before Demolition Begins

Property owners deserve full transparency on how Texas mold projects are regulated from day one through final clearance. Separating diagnosis from remediation ensures you only pay for necessary cleanup.

Methodology & Execution Workflow

STEP 01

Independent Assessment (MAC)

An Environmental Assessment Consultant measures moisture, collects lab samples, and writes a Protocol.

STEP 02

HEPA Containment Build

The remediation contractor (MRC) seals work zones under continuous negative pressure.

STEP 03

Material Removal & Scrubbing

Non-salvageable porous materials are removed and structural wood is HEPA-abraded.

STEP 04

Drying & 24–48 Hr Air Wash

Dehumidifiers dry framing (<15% WME) while HEPA scrubbers purge suspended spores.

STEP 05

PRV Testing & MDR-1 Sign-Off

Independent MAC tests air/surfaces inside containment and issues Form MDR-1.

Deliverables & Regulatory Alignment

Deliverable / Parameter Governing Authority / Standard Turnaround / Output
Complete Project Lifecycle Documentation TDLR 16 TAC § 78 + IICRC S520 Full MAC + MRC Compliance Record
TEXAS STATUTORY FIREWALL // TEX. OCC. CODE § 1958.155

Strict Non-Conflicted Project Separation

Tex. Occ. Code § 1958.155 ensures assessment and remediation remain separate contracts.

Call (281) 694-5742