Thermal & Psychrometric Audit
Non-invasive FLIR thermal scans, pinless/pin moisture mapping, and relative humidity/dewpoint logging.
Non-conflicted building moisture diagnostics, FLIR infrared thermography, Envirogyn Laboratory ASTM D7391 spore trapping, legally binding Mold Remediation Protocols, and Post-Remediation Clearance.
Under Texas Mold Assessment and Remediation Rules (16 TAC Chapter 78), any mold project impacting 25 contiguous square feet or more requires a licensed Mold Assessment Consultant (MAC) to write the Remediation Protocol and conduct independent Post-Remediation Verification.
As your independent MAC, Envirogyn represents the property owner—preventing inflated remediation bids while ensuring every moisture source, affected cavity, and clearance criterion is documented scientifically.
Non-invasive FLIR thermal scans, pinless/pin moisture mapping, and relative humidity/dewpoint logging.
ASTM D7391 slit-impaction air cassettes and direct bio-tape lifts analyzed in-house at Envirogyn Laboratory.
Legally compliant containment, HEPA air scrubbing, removal, and antimicrobial engineering instructions.
Post-work visual and air testing confirming normal fungal ecology and issuing TDI Form MDR-1.
| Deliverable / Parameter | Governing Authority / Standard | Turnaround / Output |
|---|---|---|
| Written Mold Assessment Report & Protocol | TDLR 16 TAC § 78.58 | 24–48 Hours |
| Laboratory Spore Trap CoA | Envirogyn Laboratory // ASTM D7391 | Same-Day STAT or 24-Hr Standard |
| Certificate of Mold Clearance | TDI Form MDR-1 | Same-Day upon passing PRV |
Book independent Texas statutory Mold Assessment Inspections, Remediation Protocols (MRP), or Post-Remediation Verification (PRV) / TDI Form MDR-1 Certificate issuance online.
Large commercial surveys, TX TDLR CMDR notification surcharge schedules, and MAC consulting / expert review rates.
| SKU | Service / Laboratory Method | Published Rate | Billing Basis |
|---|---|---|---|
| MAC-106 | HVAC Air Conveyance, Coil & Plenum Hygiene Assessment NADCA ACR / ANSI/IICRC S520 / ASHRAE 62.1 |
$395 (Primary HVAC System Hygiene Assessment (Incl. 2 Lab Samples)) · $195 (Additional HVAC Split System / AHU (Incl. 1 Surface Sample)) | Per HVAC System / AHU |
| MAC-107 | Building Envelope FLIR Thermography & Moisture Mapping Audit ASTM C1060 / ASTM E241 / ANSI/IICRC S500 & S530 |
$395 (Residential Envelope FLIR & Moisture Audit (<= 3,000 sq ft)) · $695 (Commercial Envelope FLIR & Moisture Audit Base (<= 10,000 sq ft)) | Per Building Envelope |
| MAC-108 | Commercial, School & Institutional IAQ & Mold Survey 16 TAC 78.52 / ASHRAE 62.1 / AIHA IAQ Guidelines |
$895 (Commercial IAQ & Mold Survey Base (<= 2,500 sq ft, Incl. 4 Samples)) · $250 (Additional Commercial AHU Zone / 2,500 Sq. Ft. (Incl. 2 Samples)) | Base Zone + Per Add'l Zone |
| PRV-202 | Commercial / Multi-Containment PRV Clearance Inspection 16 TAC 78.140 & 78.150 / ANSI/IICRC S520 / MDR-1 |
$595 (Commercial PRV Clearance Base (Up to 2 Zones, Incl. 4 24-Hr Samples)) · $150 (Additional Commercial Containment Zone (Incl. 1 24-Hr Spore Trap)) | Base (<= 2 Zones) + Add'l Zone |
| PRV-203 | Failed PRV Containment Re-Inspection Return Visit 16 TAC 78.140 / ANSI/IICRC S520 |
$245 | Per Return Inspection |
| PRV-204 | Remediation Containment & Negative-Air Field Oversight 16 TAC 78.100 / ANSI/IICRC S520 / OSHA |
$650 (Remediation Containment Oversight (Half-Day, Up to 4 Hrs)) · $1,150 (Remediation Containment Oversight (Full-Day, Up to 8 Hrs)) | Half-Day / Full-Day |
| MCON-401 | Written Building Mold Management Plan (MMP) 16 TAC 78.52(b)(4) / EPA Tools for Schools / ASHRAE |
$750 | Per Building / Facility |
| MCON-402 | Post-Water-Intrusion Psychrometric Drying Audit (ANSI/IICRC S500) ANSI/IICRC S500 / ASTM E241 |
$395 | Per Drying Verification |
| MCON-403 | New Construction / Pre-Drywall Moisture & Mold Prevention Audit ASTM E241 / IRC Framing Moisture / IICRC S530 |
$450 | Per Dwelling (<= 3,500 sq ft) |
| MCON-404 | Remediation Contractor Pre-Bid Walk & Work Plan Review 16 TAC 78.58 & 78.100 / Tex. Occ. Code 1958.155 |
$350 | Per Hour |
| MCON-405 | Mold, Water Intrusion & IAQ Expert Witness Testimony FRE 702 / Daubert / Tex. Prop. Code 92.052 / DTPA |
$350 (Case File Review & Rule 702 Expert Report Drafting (Per Hour)) · $450 (Sworn Deposition Testimony (Per Hour - 3-Hr Minimum)) · $500 (Courtroom Trial & Arbitration Testimony (Per Hour - 4-Hr Minimum)) · $2,000 (Forensic Mold Expert Witness Initial Evergreen Retainer) | Per Hour / Retainer |
| MFEE-501 | TDLR 5-Day Mold Remediation Notification Compliance Fee Tex. Occ. Code 1958.103 / 16 TAC 78.110 |
$25 | Pass-Through Per Project |
| MFEE-502 | Attic / Crawlspace Extreme-Heat or Confined-Access Differential OSHA Heat Illness & Confined Crawlspace Protocol |
$125 | Flat Field Differential |
Remediation contractors offering "free mold inspections" cannot legally test or write protocols in Texas without conflict of interest. An independent MAC gives you objective data and prevents unnecessary demolition.
Direct line to our Texas City command & microbiology laboratory desk: (281) 694-5742. Aligned with Tex. Occ. Code § 1958.155, select your independent division track below.