MLS(ASCP)CM Cert. No: 246841 ISO/IEC 17025:2017 QA ASTM E1527-21 & D7391-20 ANSI/IICRC S500 & S520 Veteran-Owned
Home Restoration ANSI/IICRC S520 Remediation Division
BUILDING RESTORATION // ANSI/IICRC S520 CONTAINMENT

ANSI/IICRC S520 Mold Remediation & Negative-Air HEPA Containment

Code-compliant microbial remediation, negative-pressure 6-mil polyethylene chambers, true-HEPA air scrubbing, and precision structural cleaning engineered to pass independent clearance.

ANSI/IICRC S520 Remediation Division Envirogyn Assessment Division Envirogyn Laboratory
Call (281) 694-5742 Full Project Form
5.0 ★ Google Verified (26 Reviews) • Zero Upsell: Statutory § 1958.155 Firewall • Direct Dispatch: 15–60 Min Callback
Envirogyn ANSI/IICRC S520 technician installing negative-pressure HEPA containment
Envirogyn Technical Practice Houston & Galveston Gulf Coast
TECHNICAL SCOPE & ENGINEERING STANDARD

Surgical Remediation That Protects Indoor Air & Passes Clearance First Time

Spraying bleach or paint over active mold traps moisture and scatters microscopic fragments through HVAC return vents. Under Texas TDLR rules and ANSI/IICRC S520, proper mold remediation requires physical removal of fungal biomass inside sealed negative-pressure containment.

Executing ANSI/IICRC S520 containment, negative-air HEPA scrubbing, and source removal cleanly to pass independent Post-Remediation Verification (PRV) visual and ASTM D7391 air clearance testing.

Methodology & Execution Workflow

STEP 01

Negative-Pressure Containment

Seal 6-mil flame-retardant chambers with zip-walls, decon airlocks, and HEPA exhaust.

STEP 02

Controlled Porous Removal

Bag contaminated drywall/insulation inside containment without dragging debris through hallways.

STEP 03

HEPA Vacuuming & Media Abrasion

HEPA vacuum + wire-brush/sand affected wood studs and framing to remove fungal roots (hyphae).

STEP 04

Air Washing & Clearance Handoff

Continuous HEPA filtration until independent third-party MAC clears containment and signs MDR-1.

Deliverables & Regulatory Alignment

Deliverable / Parameter Governing Authority / Standard Turnaround / Output
TDLR Work Plan & Notification 16 TAC § 78.56 Filed prior to projects >= 25 sq. ft.
HEPA Containment & Filtration ANSI/IICRC S520 (≥ 4–6 ACH) Daily differential manometer logs
MRC Portion of TDI Form MDR-1 Tex. Ins. Code § 544.303 Co-signed at project completion
TEXAS STATUTORY FIREWALL // TEX. OCC. CODE § 1958.155

Strict Non-Conflicted Project Separation

When retained as your Mold Remediation Contractor, Texas law prohibits Envirogyn from assessing the same project; an independent Assessment Consultant must author the protocol and verify clearance.

TECHNICAL QUESTIONS & COMPLIANCE

Frequently Asked Questions

How long must I stay out of containment areas during remediation?

Because our negative-pressure containment isolates affected rooms from occupied zones, families or office staff can often remain outside work areas on multi-zone properties, though active demolition rooms remain sealed until independent MAC clearance passes.

Call (281) 694-5742