Double-Layer 6-Mil Poly & -0.020 in. wc
Specifies floor-to-ceiling fire-retardant polyethylene sheeting, 3-stage decontamination airlocks, continuous HEPA filtration (≥4 ACH vented outdoors), and continuous digital manometry.
Order Written MRP →
Texas law requires a licensed Mold Assessment Consultant’s written blueprint whenever fungal damage meets or exceeds 25 contiguous square feet. Give contractors exact containment boundaries, negative-air physics, flood-cut elevations, and clearance benchmarks.
Same-Day 4–8 Hr STAT Turnaround Available • Unlocks Statutory TDLR 5-Day Notification & Fair Contractor Bids
A strong protocol leaves zero ambiguity for the contractor, protects occupants outside containment, and simplifies insurance claim approval.
Specifies floor-to-ceiling fire-retardant polyethylene sheeting, 3-stage decontamination airlocks, continuous HEPA filtration (≥4 ACH vented outdoors), and continuous digital manometry.
Order Written MRP →
Porous drywall and insulation are demolished at least 24 inches past all visible staining or damp boundaries, followed by structural wire-brush abrasion and HEPA vacuuming — prohibiting chemical fogging.
See Post-Work PRV Verification →
Requires plumbing or envelope leaks to be corrected prior to clearance, and enforces pre-demolition NESHAP asbestos & EPA RRP lead-paint compliance before disturbing suspect materials.
Pair With Initial Assessment →
Eliminates contradictory restoration quotes by fixing exact square footage, HVAC shutoff locks, PPE respiratory classes (NIOSH P100), and objective PRV pass thresholds upfront.
Add Pre-Bid Work Plan Audit →
Each written MRP provides crystal-clear engineering tables, wall-by-wall cut dimensions, HEPA abrasion rules, HVAC isolation directives, and exact PRV clearance criteria — immediately actionable by any Texas-licensed Mold Remediation Contractor.
Fast digital delivery ready for contractor TDLR 5-day advance filing and insurance submission.
Written Texas work specification when diagnostic data already exists — engineered for projects ≥25 contiguous sq ft requiring immediate TDLR 5-day contractor filing.
Complete on-site forensic inspection, FLIR/moisture logging, 4 ASCP laboratory samples, and the full engineered Mold Remediation Protocol in one deployment.
Independent post-remediation inspection confirming your contractor achieved every negative-air, dry-standard (≤16% MC), and air-parity clause in the protocol.
Texas law prohibits the same entity from writing a remediation protocol or performing Post-Remediation Verification (PRV) on the same project where it performs contracting work. When Envirogyn serves as your Mold Assessment Consultant, we deliver unbiased thermal diagnostics, calibrated ASTM lab counts, written Mold Remediation Protocols, and independent PRV clearance — while recommending zero remediation upsells.
Everything homeowners, adjusters, and builders need to know about 16 TAC § 78.100 MRPs.
Under 16 TAC § 78.100 and Tex. Occ. Code Ch. 1958, any mold remediation project affecting 25 or more contiguous square feet requires a licensed Mold Assessment Consultant to prepare a written Mold Remediation Protocol prior to work start, and a licensed Mold Remediation Contractor to submit a 5-day TDLR notice.
Our MRP specifies containment design (full 6-mil fire-retardant poly vs mini-enclosure), 3-stage decontamination airlocks, continuous negative-air filtration (≥4 ACH at -0.020 in. wc), HEPA vacuum + wire-brush mechanical abrasion, +24-inch flood-cut drywall margins past wet substrates, PPE tiers, NESHAP asbestos/RRP pre-demo safety gates, and PRV clearance benchmarks.
Order Standalone MRP (MAC-105, $450) when you already possess a valid recent Mold Assessment Report or contractor-scoped emergency loss and urgently need the statutory blueprint (4–8 hr STAT turn available). Choose MAC-104 ($895) when you need Envirogyn to both perform full forensic diagnostics/lab testing and draft the remediation protocol.
Without a detailed MRP, competing contractors quote completely different scopes — one bidding cheap spraying and another bidding full containment. An MRP forces every contractor to bid the exact same linear cut lines, HEPA scrubbing hours, and rebuild clearance standard.
Spraying fungicides or paint-over sealants onto dirty wood hides residual spores and allergens without restoring Condition 1 hygiene. Both ANSI/IICRC S520 and the U.S. EPA require physical removal of porous substrates and mechanical HEPA abrasion of structural framing.
Independent four-gate clearance inspection once your contractor finishes executing this protocol.
Explore PRV & Clearance → SPECIALIZED FORM • 16 TAC § 78.150How Box A (MRC) and Box B (MAC) on TDI Form PC326 MDR-1 protect insurance eligibility.
Inspect CMDR Page → SERVICE 04 • PROACTIVE PLANSPre-drywall construction moisture audits, facility O&M plans, and contractor pre-bid reviews.
Explore Mold Plans →Direct line to our Texas City command & microbiology laboratory desk: (281) 694-5742. Aligned with Tex. Occ. Code § 1958.155, select your independent division track below.