MLS(ASCP)CM Cert. No: 246841 ISO/IEC 17025:2017 QA ASTM E1527-21 & D7391-20 ANSI/IICRC S500 & S520 Veteran-Owned
Home Consulting ASTM E1527-21 / 40 CFR 312
ASTM E1527-21 // COMMERCIAL REAL ESTATE DUE DILIGENCE

Phase I Environmental Site Assessments (ASTM E1527-21)

Court-defensible All Appropriate Inquiries (AAI) and CERCLA Innocent Landowner protection for commercial acquisitions, SBA 7(a)/504 lenders, industrial sites, and multi-family portfolios across Texas.

ASTM E1527-21 / 40 CFR 312 Envirogyn Assessment Division ANSI/IICRC S520 Remediation Division Envirogyn Laboratory
Call (281) 694-5742 Full Project Form
5.0 ★ Google Verified (26 Reviews) • Zero Upsell: Statutory § 1958.155 Firewall • Direct Dispatch: 15–60 Min Callback
Qualified Environmental Professional performing ASTM E1527-21 commercial Phase I site reconnaissance
Envirogyn Technical Practice Houston & Galveston Gulf Coast
TECHNICAL SCOPE & ENGINEERING STANDARD

Lender-Accepted Commercial Environmental Due Diligence

A Phase I Environmental Site Assessment (ESA) is the recognized standard before acquiring commercial, industrial, hospitality, or multi-family real estate. Envirogyn executes every investigation under ASTM E1527-21 and EPA 40 CFR Part 312 All Appropriate Inquiries so buyers qualify for CERCLA liability defenses.

Led by a Senior Qualified Environmental Professional (ASTM E1527-21 Appendix X2, 20+ years experience across Gulf Coast petrochemical, retail, and warehouse corridors), each dossier evaluates historical land uses back to 1940, regulatory spill/leaking underground storage tank (LPST) records, vapor encroachment pathways, and adjacent industrial risks.

Methodology & Execution Workflow

STEP 01

Historical & Regulatory Audit

Sanborn fire insurance maps, historical aerial photography, topographic maps, city directories, and federal/TCEQ database screening.

STEP 02

Physical Site Reconnaissance

Walk-through of property boundaries, chemical storage, staining, floor drains, transformers, and adjacent property industrial threats.

STEP 03

Interviews & Chain of Title

Key site manager interviews, owner environmental lien/AUL checks, and municipal fire/health records queries.

STEP 04

Signed EP Determination

Formal identification of RECs, CRECs, or HRECs with lender-ready executive recommendations.

Deliverables & Regulatory Alignment

Deliverable / Parameter Governing Authority / Standard Turnaround / Output
Phase I ESA Dossier ASTM E1527-21 / 40 CFR Part 312 5–10 Business Days (72-Hr Expedite Available)
REC / CREC / HREC Classification US EPA AAI Standards Written EP Legal Liability Determination
Tier 1 Vapor Encroachment Screen ASTM E2600 Screening Included with Commercial Packages
ASTM E1527-21 / E1528-22 DUE DILIGENCE • BOOK ONLINE

Phase I ESA & Transaction Screen Fixed-Price Tiers

Order commercial due diligence assessments online via Stripe Checkout, or expand our schedule below for Phase II Geoprobe drilling, vapor intrusion (TO-15), NELAP chemistry, and T&M labor rates.

Environmental Transaction Screen Assessment (ASTM E1528-22)
ESA-101 ASTM E1528-22

Environmental Transaction Screen Assessment (ASTM E1528-22)

$1,450 / assessment
  • ASTM E1528-22 Transaction Screen Questionnaire & site walk
  • Federal EPA & Texas TCEQ LPST/VCP regulatory database check
  • Sanborn fire map & limited historical occupancy review
Phase I Environmental Site Assessment — Commercial / Vacant Land (ASTM E1527-21)
ESA-102 ASTM E1527-21

Phase I Environmental Site Assessment — Commercial / Vacant Land (ASTM E1527-21)

$2,450 / assessment
  • Full ASTM E1527-21 & EPA 40 CFR 312 AAI compliance
  • Historical aerials, Sanborn maps & city directories back to 1940
  • REC / CREC / HREC classification & Tier 1 Vapor Screen
Phase I Environmental Site Assessment — Multi-Family, Retail Center or 5–25 Acres
ESA-103 ASTM E1527-21

Phase I Environmental Site Assessment — Multi-Family, Retail Center or 5–25 Acres

$3,250 / assessment
  • Built for multi-family, hospitality & 5-25 acre commercial sites
  • Meets Fannie Mae, Freddie Mac & HUD MAP lender checklists
  • Full historical research, adjacent REC audit & EP sign-off
Phase I ESA — Industrial, Auto/Fueling, Dry Cleaner or Oilfield (ASTM E1527-21)
ESA-104 ASTM E1527-21

Phase I ESA — Industrial, Auto/Fueling, Dry Cleaner or Oilfield (ASTM E1527-21)

$3,950 / assessment
  • Engineered for industrial, UST, dry cleaner & oilfield tracts
  • Deep TX Railroad Commission (RRC) & TCEQ file FOIA review
  • Includes PFAS emerging contaminant desktop risk screen
Phase II Subsurface Investigation, NELAP Chemistry & EP Labor Schedule

Custom lender reliance letters, ASTM E1903 Phase II borings, Vapor Pin TO-15 canisters, TCEQ TX1005 / EPA 8260D / 1633 PFAS lab assays, and credentialed staff rates.

Phase I Extensions & Phase II Subsurface Investigation

SKU Service / Laboratory Method Published Rate Billing Basis
ESA-105 Phase I ESA 180-Day Viability Update (ASTM E1527-21 § 4.6)
ASTM E1527-21 § 4.6 / 40 CFR 312
$1,350 Per Update (Within 180-365 Days)
ESA-106 Phase I ESA Lender & Non-Scope Add-Ons (SBA Reliance, VEC, Lien/AUL)
SBA SOP 50 10 / ASTM E2600-22 / ASTM E1527-21
$395 (Executed SBA 7(a)/504 or Institutional Lender Reliance Letter) · $550 (Standalone ASTM E2600-22 Vapor Encroachment Screen Report) · $350 (Environmental Lien & Activity/Use Limitation (AUL) Title Search) Per Lender / Report Add-On
ESA-201 Phase II Sampling & Analysis Plan (SAP), OSHA HASP & Private GPR Utility Locate
ASTM E1903-19 / OSHA 1910.120 / Texas 811
$1,250 (Phase II Sampling & Analysis Plan (SAP) & OSHA HASP) · $950 (Texas 811 + Private GPR/EM Subsurface Utility Clearance) Per Pre-Drilling Scope
ESA-202 Limited Targeted Phase II Subsurface Investigation — Single REC (ASTM E1903-19)
ASTM E1903-19 / TCEQ TRRP 30 TAC Ch. 350
$6,450 Per Single-REC Investigation
ESA-203 Standard Commercial Phase II Soil & Groundwater Investigation (ASTM E1903-19 / TCEQ TRRP)
ASTM E1903-19 / TCEQ TRRP 30 TAC Ch. 350 / TDLR Drillers
$11,950 Per Standard Commercial Investigation
ESA-204 Sub-Slab Soil-Gas & Indoor Air Vapor Intrusion Investigation (ASTM E1903 / EPA TO-15)
ASTM E1903-19 / ASTM E2600 / EPA Method TO-15
$5,450 (Turnkey 5-Sample Sub-Slab Soil-Gas & Indoor Air VI Survey (EPA TO-15)) · $495 (Additional Sub-Slab Vapor Pin or 6L Summa Canister + EPA TO-15 Lab) Turnkey 5-Sample / Add'l Summa
ESA-205 Direct-Push Geoprobe Drilling Rig, Piezometer & IDW Field Unit Rates
TDLR Water Well Drillers / 16 TAC Ch. 76 / DOT
$3,450 (Direct-Push Geoprobe Drilling Rig & Crew (Full Day)) · $450 (Temporary 1-In. PVC Groundwater Piezometer Install & Plugging (Each)) · $225 (55-Gal DOT Steel Drum IDW Soil / Purge Water Staging (Per Drum)) Per Rig Day / Well / Drum

NELAP Environmental Chemistry & Credentialed T&M Labor

SKU Service / Laboratory Method Published Rate Billing Basis
ELAB-301 NELAP Total Petroleum Hydrocarbons Soil/Water Analysis (TCEQ Method TX1005)
TCEQ Method TX1005 / TNI NELAP / TRRP
$115 (NELAP Total Petroleum Hydrocarbons TCEQ TX1005 (Standard 5-7 Day)) · $175 (NELAP Total Petroleum Hydrocarbons TCEQ TX1005 (48-Hr RUSH)) Per Soil / Water Sample
ELAB-302 NELAP Volatile Organic Compounds & BTEX Soil/Water Analysis (EPA Method 8260D)
SW-846 EPA Method 8260D / TNI NELAP
$145 (NELAP VOCs & BTEX Full Scan EPA 8260D (Standard 5-7 Day)) · $220 (NELAP VOCs & BTEX Full Scan EPA 8260D (48-Hr Priority RUSH)) Per Soil / Water Sample
ELAB-303 NELAP Semi-Volatile Organics / PAHs Soil/Water Analysis (EPA Method 8270E)
SW-846 EPA Method 8270E / TNI NELAP
$215 Per Soil / Water Sample
ELAB-304 NELAP RCRA 8 & Texas 11 Priority Metals Analysis (EPA 6010D / 6020B / 7470A)
EPA 6010D / 6020B / 7470A / 7471B / TRRP
$165 (NELAP RCRA 8 Heavy Metals Panel (Standard 5-7 Day)) · $210 (NELAP Expanded Texas 11 Priority Metals Panel (Standard 5-7 Day)) Per Soil / Water Sample
ELAB-305 NELAP Emerging Contaminants — PFAS 40-Compound Analysis (EPA Method 1633)
EPA Method 1633 (LC-MS/MS) / ASTM E1527-21 PFAS
$425 Per Soil / Water Sample
LBR-701 Principal Environmental Scientist / Qualified EP Labor (T&M)
40 CFR 312.10 EP / BLS SOC 19-2041 Senior / ASTM E1527-21 & E1903
$225 (Principal Environmental Scientist / Qualified EP (Hourly T&M)) · $335 (Principal Environmental Scientist / EP (After-Hours / Weekend)) · $1,650 (Principal Environmental Scientist / EP (Full 8-Hr Day Rate)) Per Hour / Day (2-Hr Field Min)
LBR-702 Environmental Scientist & Specialist Labor (SOC 19-2041 — T&M)
BLS SOC 19-2041 / ASTM / TCEQ / NEPA
$155 (Environmental Scientist & Specialist SOC 19-2041 (Hourly T&M)) · $230 (Environmental Scientist & Specialist (After-Hours / Weekend)) · $1,150 (Environmental Scientist & Specialist (Full 8-Hr Day Rate)) Per Hour / Day (2-Hr Field Min)
LBR-703 Mold Assessment Consultant Labor (Senior Consultant — T&M)
16 TAC 78.52 / Tex. Occ. Code Ch. 1958
$175 (Senior Mold Assessment Consultant (Hourly T&M)) · $260 (Senior Mold Assessment Consultant (After-Hours / Weekend)) · $1,250 (Senior Mold Assessment Consultant (Full 8-Hr Day Rate)) Per Hour / Day (2-Hr Field Min)
LBR-704 Field Environmental Assessment Technician Labor (— T&M)
16 TAC 78.50 / ASTM D7391 & D7910
$110 (Environmental Mold Assessment Technician MAT (Hourly T&M)) · $165 (Mold Assessment Technician MAT (After-Hours / Weekend)) · $795 (Mold Assessment Technician MAT (Full 8-Hr Day Rate)) Per Hour / Day (2-Hr Field Min)
LBR-705 Environmental Lead Risk Assessor Labor (EPA / HUD LRA — T&M)
25 TAC 295.207 / EPA 40 CFR 745.226 / HUD
$165 (Certified Lead Risk Assessor LRA (Hourly T&M)) · $245 (Certified Lead Risk Assessor LRA (After-Hours / Weekend)) · $1,195 (Certified Lead Risk Assessor LRA (Full 8-Hr Day Rate)) Per Hour / Day (2-Hr Field Min)
LBR-706 Environmental Lead Paint Inspector Labor (EPA / HUD LBI — T&M)
25 TAC 295.206 / HUD Ch. 7 / ASTM E1729
$125 (Certified Lead-Based Paint Inspector LBI (Hourly T&M)) · $185 (Certified Lead Inspector LBI (After-Hours / Weekend)) · $895 (Certified Lead Inspector LBI (Full 8-Hr Day Rate)) Per Hour / Day (2-Hr Field Min)
LBR-707 Environmental Science & Protection Technician Labor (SOC 19-4042 — T&M)
BLS SOC 19-4042 / OSHA / EPA / NIOSH
$95 (Environmental Science & Protection Tech SOC 19-4042 (Hourly T&M)) · $143 (Env Science & Protection Tech (After-Hours / Weekend)) · $695 (Env Science & Protection Tech (Full 8-Hr Day Rate)) Per Hour / Day (2-Hr Field Min)
EQP-708 Specialized Diagnostic Field Instrumentation Usage (T&M Daily)
NIST-Calibrated Field Instrumentation
$195 (Portable XRF Lead Paint Spectrum Analyzer (Per Day)) · $125 (10.6 eV PID Photoionization VOC Soil/Air Detector (Per Day)) · $125 (FLIR Radiometric IR Camera, Borescope & Moisture Kit (Per Day)) · $150 (Multi-Parameter IAQ, PM2.5/PM10 & Micromanometer Rig (Per Day)) Per Instrument Day
All itemized lab fees, additional sampling points, and commercial T&M scopes are invoiced cleanly via Stripe after scope confirmation. Request Custom Estimate / Invoice →
TECHNICAL QUESTIONS & COMPLIANCE

Frequently Asked Questions

What is the shelf life of an ASTM E1527-21 Phase I ESA?

Under ASTM E1527-21, specific components (interviews, environmental lien searches, government records reviews, visual site inspection, and EP declaration) remain valid for 180 days prior to the date of acquisition.

Do you support SBA 7(a), SBA 504, and Fannie Mae / Freddie Mac loans?

Yes. Our Environmental Professionals execute SBA reliance letters and lender-specific questionnaire formats along with accelerated closing turnarounds.

Call (281) 694-5742